Detailed survey and engineering behind India's transmission & distribution lines.

GeoCADD Power Services has carried out route survey, PLS-CADD profiling and geotechnical investigation for power transmission and distribution projects since 2008 — for utilities, EPC contractors and government agencies across India and abroad.

2008Founded & operating
ISO 9002Certified processes
India + CongoProject geography

About GeoCADD

A survey and engineering partner for power infrastructure projects.

Since 2008, GeoCADD Power Services has worked alongside utilities, transmission EPC contractors and consultants on the ground-level engineering that transmission and distribution lines depend on: route alignment, detailed line survey, PLS-CADD profiling and soil investigation.

The company's assignments have covered voltage classes from 11kV distribution to 400kV double-circuit transmission lines, across states including Rajasthan, Gujarat, Haryana and Uttar Pradesh, as well as an international distribution-line survey for the Republic of Congo.

The company is led by Tejpal Singh, Owner, who has overseen its survey and field operations from the corporate office in New Delhi since inception.

Company snapshot

Key facts, drawn from our project records and registrations.

  • Established2008
  • OwnerTejpal Singh
  • CertificationISO 9002
  • Corporate officeNew Delhi
  • Line voltages surveyed11kV – 400kV
  • International projectRepublic of Congo

What we do

Field survey and engineering services

Every service below reflects work we have delivered on active transmission and distribution projects.

Transmission line survey & PLS-CADD profiling

Route survey, profiling and tower spotting for 11kV to 400kV single- and double-circuit lines.

Geotechnical & soil investigation

SPT, soil resistivity testing, auger boring and foundation investigation for tower and structure design.

Route alignment & feasibility studies

Preliminary and detailed route studies, GPS/GIS mapping, and forest, river and aviation crossing identification.

Survey documentation & reporting

AutoCAD line schedules, coordinate and profile reports, and BOQ preparation for client and statutory approval.

Distribution line survey

MV/LV distribution line survey and profiling for rural and urban electrification, including cross-border assignments.

Project & quality compliance

ISO 9002-certified processes and documentation for regulatory and statutory submissions.

Selected assignments

Project work, drawn from our records

A sample of the transmission and distribution line assignments carried out for clients since 2008.

Overseas Infrastructure Alliance (India) Pvt. Ltd.
Detailed survey of MV/LV distribution lines using modern survey techniques
Republic of Congo
Power & Energy Consultants
Survey for 400kV D/C transmission line, Babai – Jaipur (North)
Rajasthan
Bajaj Electricals Limited
Detailed survey of the 24.27km Chorasi – Kosamba 400kV GETCO line
Gujarat
Larsen Engicon Pvt. Ltd.
Route alignment and detailed survey of 132kV EHV transmission lines
Haryana
Unitech Power Transmission Ltd.
Survey for 220kV D/C transmission line at Bair Machine (RVUN)
Rajasthan
Trading Engineers (International) Limited
Survey & profiling of 146 circuit km of 220kV and 132kV lines for U.P.P.T.C.L
Uttar Pradesh

Trusted by

Clients we have worked with

RITES Limited Bajaj Electricals Limited Larsen Engicon Pvt. Ltd. DITI Power Lines Trading Engineers (International) Ltd. Power & Energy Consultants ISOLUX CORSAN SOMA JV Unitech Power Transmission Ltd. Overseas Infrastructure Alliance (India) Pvt. Ltd. B.S. Shree Construction Technology Pvt. Ltd.
TS

Tejpal Singh

Owner, GeoCADD Power Services

"Every survey we run — whether it's a soil test at a single tower or a distribution line running across a border — has to hold up when it's built from. That's what our clients have come back for since 2008."